
CHAPTER 1 · WHY ALOFT
The same swim. A fraction of the fuss
A traditional inground pool means months of excavation, separate fencing approvals, and a build that takes over your yard. An Aloft Pool arrives finished — and stays beautiful long after the trucks have left.
01 / BUILT FOR NARROW
BLOCKS
Designed for
Perth Backyards
Slim footprint, side-access friendly, and engineered to land on existing paving or concrete. No fleet of trucks. No torn-up lawn.
02 / INSTALL IN A SINGLE DAY
Finished by the time you finish work.
Your Aloft arrives complete from our Perth workshop. Cranes in, levels up, and is ready to fill — typically within eight hours.
03 / SAFETY BUILT-IN
Compliant fence,
by design.
The slatted exterior is your AS 1926.1 barrier — no separate $5k–$15k fence required. We handle the paperwork.
01 / BUILT FOR NARROW
BLOCKS
Move house? Take it with you.
An Aloft is engineered to relocate. If you sell — or just rearrange the garden — your pool can come along for the ride.
CHAPTER 3 · THE 2026 RANGE
Three sizes. One Philosophy.
ALL MODELS AS 1926.1 COMPLIANT · BLACK SLATTED · INBUILT SAFETY GATE
· VIEWING WINDOW INCLUDED · POOL EQUIPMENT INCLUDED
01 / BUILT FOR NARROW
BLOCKS
Move house? Take it with you.
An Aloft is engineered to relocate. If you sell — or just rearrange the garden — your pool can come along for the ride.
CHAPTER IV THE PROCESS
From deposit to
swim, in six steps.
Your Aloft arrives complete from our Perth workshop. Cranes in, levels up, and is ready to fill — typically within eight hours.
01
FIRST CONVERSATION
Consultation & site visit
We confirm pool placement, check boundary fence heights, NCZ compliance, and crane or HIAB access — either on site or remotely with photos and plans.
WEEK
0
02
THE AGREEMENT
Quote confirmed
You receive a tailored quote based on site conditions, access requirements and selected options. A deposit secures your build slot.
WEEK
1
03
IN THE WORKSHOP
Pool production starts
Your pool is manufactured off-site over roughly 12 weeks. We coordinate approvals and installation planning in parallel, so nothing waits in line.
WEEK
1 - 12
04
COUNCIL & CERTIFICATION
We handle the paperwork
We prepare and lodge all required council documentation on your behalf. Approvals typically take 15–25 business days, and we keep you posted as they progress.
DAYS
15 -25
05
SITE PREPARATION
Site works
A few days before install, we prepare the pool footprint — ground compaction and final access checks. Usually 2–3 hours on site.
WEEK
12+
06
DELIVERY DAY
Install day
Crane in, level up, connect the power. Installs typically take 5–6 hours. Balance of the invoice is due prior to install, then it's yours to enjoy.
WEEK
14
Want to see an Aloft Pool, in person?
We can bring a fully-assembled above-ground pool right to your home, so you can picture it in your small Perth backyard and imagine those summer afternoons with the kids. No showrooms, no pressure.
​
Prefer to come to us?
You can also visit our Nedlands storage facility and walk through a finished pool anytime.
.png)